IL&FS bags Rs.84 Cr Order for construction of 5 Elevated Stations on Gurgaon Metro

Hyderabad (HYB): Hyderabad-based infrastructure company, IL&FS Engineering and Construction Company Limited (IL&FS Engineering Services) has won a Rs 84.3 crore order for the construction of elevated stations for the Phase-II of the Gurgaon Rapid Metro Rail Project (RMRG).

The contract involves civil structural works for construction of five elevated stations at sectors 53-54 and 55-56 in Gurgaon (south extension). The total value of the contract is Rs 84.30 crore and is to be completed in 24 months.

The company is also executing a contract for the construction of a double-track elevated viaduct for Phase-II of RMRG, the company said in a filing to the BSE on Monday.

Facebooktwittergoogle_plusredditpinterestlinkedinmail